RE: La Radioterapia in campo oncologico.
L'Olanda costruirà un nuovo reattore per ricerca a e produzione di radioisotopi al posto del vecchio HFR:
"
Petten replacement approved
Meanwhile, the Dutch government has given its approval for the construction of a replacement for the ageing High Flux Reactor (HFR) at Petten. The Dutch Ministry of Economic Affairs, Agriculture and Innovation announced the cabinet's decision on 20 January. The ministry said that the government and the province of Noord-Holland would each provide €40 million ($52 million) for the design, procurement and licensing procedure of the Pallas reactor.
Since it became operational in September 1960, the 45 MW HFR at Petten has been largely shifted from reactor materials testing to fundamental research and the production of medical radioisotopes. The reactor has for a long time supplied about 60% of Europe's and 30% of the world's supply of medical radioactive sources.
"
|